M&T Shop Building: Raising Day One


Today was the first day of the shop raising and, wow, was it momentous. The day started with finishing the new sill Luke, Matt, and Isaac began the day before. This 8” wide by 10” tall sill sits on top of the deck to raise the ceiling height. It is joined in the traditional manner with pegged mortise and tenon joints. After the sill was assembled and bolted to the deck, we began assembling the first (rearmost) bent.

We assembled the joints on sawhorses and drilled and pegged each tenon. Peg sizes varied from 1-3/8” to 1” to 3/4” depending on the joint. Because the pegs Luke purchased weren’t available in the odd 1-3/8” size that this frame was made with, Mike and I spent a good chunk of our day shaving the pegs to final size.  Once the bent was fully assembled, Luke and Isaac measured the tenon spacing and braced the assembly with 2x4s to keep them in position.

Matt carried the bent with the telehandler as Luke directed it into the mortises. It was pretty incredible to watch these two work together. Their subtle but effective communication showed that they’ve been doing this for a long time. With each tenon slipping seamlessly into its mortise, the first wall was standing.  

Between the physical labor these guys have gone through and the stress of crucial measurements working out, I think everyone working on this project was feeling wiped at the end of the day. But the day went off without a hitch. Tomorrow, bright and early we begin assembling the second bent.

 - Joshua

 


Would you like email notifications of our daily blog posts? Sign up below...