After Mike and I got all the granite blocks squared and leveled on the gravel pad, we fit hardware cloth over the ventilation spacing between the blocks to keep critters out. This cloth was bent around top and bottom of the blocks and glued in place with construction adhesive to ensure there was no way anything was getting under there. We laid six-mil plastic over the gravel inside the foundation to seal off future moisture release. Then, on top of the granite we half lapped a pressure-treated 2x6 to overhang the blocks by 1” on all sides. The conventional TJI deck was then constructed on top of that. These man-made joists are unpleasant to work with but are functional and...
Now that Issue Three is at the printer and my edits to the Fisher book are complete, Mike and I have begun getting things ready for the new M&T shop frame to arrive on the 18th. We started the morning staring at a pile of granite foundation blocks. We gathered small log rounds, pry bars, and all other manner of tools to muscle the 100 linear feet of granite into place on the gravel pad. After we got a few pieces in place, a stone mason friend of mine, Ken stopped over on a lead from a neighbor. He showed up to generously share his experience and knowledge of the finer points of moving large stone. With his help, we...
The Tuesday morning Issue Three pre-order launch was nuts. Mike and I stayed up late with last minute prep and double (and triple) checking all the store’s settings for the launch. We knew we had at least a few folks that would stay up late to order at midnight so we wanted to make sure there weren’t going to be any glitches. I called Mike at 11:50 p.m. to check in and review our launch check list (update inventory, publish blog post, post on social media, etc.). We divvied up the list and waited until the clock struck 12:00 exactly. As we worked through our check list, we were watching for the first 25 orders to come in to...